[slide-right]• Optimal coordination and communication due to collaborative approach process • Cooperative relationships minimize delays in schedule • Cost savings due to early value engineering collaboration with client and owner • Verifying constructability of project in design stage reduces changes and keeps costs low • Shortened project durations • Responsible subcontractor selection[/slide-right]
[slide-left]• Single source responsibility • Professional teams experienced in specific project requirements / criteria • Collaboration early in the design phase minimizes cost and risks associated with changes made later on • Minimizes disputes as to the scope of the work presented in the contract documents • Continual analysis and monitoring of project budget, schedule and constructability • Shortened project schedule[/slide-left]